2014年6月16日星期一

on the section of the river is a special case of the Chinese sturgeon core protection area

in new network Yichang on 16 June, (Liu Liangwei Cheap Lions Jerseys Guo Xiaoying Ouyang Bo) in June 16th, second of the world base plate and girder suspension bridge -- Hubei Yichang Miao Zui Yangtze River bridge cat construction guide rope successful traction Cheap Falcons Jerseys across the river, marking the bridge completely into the upper structure construction stage.

on the same day at nine thirty-six in the morning, 1440 horsepower tugboat towing cable across the river north and south sides of the Strait, eleven eight, traction rope success "docking", then, on both sides of the guide rope winch launch and adjust to the design position.

temple in Yangtze River bridge is the construction of Yichang Cheap Panthers Jerseys mouth area and an important node construction control engineering in three vertical and five horizontal road network, but also to ensure that the Three Gorges Dam, Gezhouba Dam dam safety anti-terrorism facilities bridge. The project from 2009 officially started, consisting Cheap Packers Jerseys of the river bridge, Sanjiang bridge, South Bridge, a total length of 3234 meters, two-way six lane, a total investment of 2750000000 yuan, is the second Wuhan parrot Island Bridge, the world with second steel plate girder suspension bridge.

on the section of the river is a special case of the Chinese sturgeon core protection area, the bridge 823 meters of the bridge and the Sanjiang bridge across the river, the design scheme is not built piers in the water, the protection of rare fish migration is not affected, and is convenient for ship navigation.

according to the chief engineer of China Railway Bridge Bureau of Yichang Miao Zui Yangtze River bridge project department Chen Guoxiang introduced, the guide rope across the river marks the Miao Zui Yangtze River bridge into a real "bridging" stage, plan and construction units to complete the catwalk erection with the time of 2 months, completed by the end of the main cable, the first half of 2015 for erection of steel box girder, Cheap Ravens Jerseys and strive to as soon as the completed.

(end)

没有评论:

发表评论